In the face of freezing temperatures and winter weather, members of Ironworkers Local 7 completed the installation of a new pedestrian bridge at 50 Northern Avenue, connecting the Vertex headquarters with a new building currently under construction on its campus.
Despite snow and cold creating logistical challenges, our members rose to the occasion, executing a complex, high-profile installation with precision, teamwork, and professionalism. The finished bridge is a standout addition to the Seaport waterfront and a powerful example of the skill and craftsmanship Ironworkers Local 7 brings to major infrastructure projects.
This achievement reflects the dedication of our members and the pride they take in building Boston’s future, even under the toughest conditions.