The Border Roads Organisation (BRO) on Monday (November 23, 2026) said it was widening the tracks for pilgrims’ safeguard and took all measures “to ensure safe disposal of excavated material, and minimise disturbance to surrounding terrain” while deploying an earthmover at the high-altitude alpine lake of Sheshnag on the way to the Amarnath cave in south Kashmir’s Anantnag.
The BRO statement came in the wake of growing outcry from Jammu and Kashmir’s political parties and locals over the use of the earthmover at the lake, after a video went viral on social media platforms.
“The organisation is carrying out post-Amarnath ji yatra works in compliance with all applicable safety norms and environmental safeguards. The BRO takes all measures to ensure safe disposal of excavated material, protect natural drainage and minimise disturbance to surrounding terrain. The recently circulating video on social media claims about new works is incorrect,” said an official.
It said based on experience of previous yatras and requirement highlighted for a wider road for the convenience of the pilgrims, the BRO has started “widening of tracks focusing on stabilising vulnerable stretches and widening the tracks as prescribed to ease congestion and allow safer passage”.
News in Frames | A sacred trail of faith and fellowship
Common calling: A multitude of people from different walks of life wait in queues, amid tight security, to register for the yatra at Baltal.
Misty beginnings: Pilgrims gather early in the morning amid rainfall before beginning their journey to the Amarnath cave shrine from the Baltal base on July 3.
Keeping watch: Security personnel maintain have to maintain constant vigil at the Baltal base camp in Ganderbal district of Kashmir.
Shared spirit: People, with required documents in hand, pose for a photo as they wait to register for the Amarnath yatra at Baltal.
The long climb: Atop ponies or walking with sticks in hand, devotees begin their arduous journey through the Himalayas to the Amarnath cave shrine, located at an altitude of about 13,000 feet in Anantnag district.
Braving the elements: This season’s first batch of pilgrims walk past a waterfall on the 14-km Baltal route in Ganderbal of Kashmir.
Sharing warmth: A volunteer prepares a sweet dish for the travellers at the base camp.
Powering through: Braving drizzle and unpredictable Himalayan weather, devotees in raincoats make their way along the mountain trail towards the Shiva shrine.
Beneath the peaks: An aerial view of the Baltal base camp.
Shouldering hope: Without the vital support of porters who carry heavy loads, many pilgrims would be unable to undertake the yatra.
1/3
For existing tracks only: BRO
“The works are confined to the existing tracks. BRO’s primary objective is to safeguard pilgrims throughout the yatra. By making these tracks safer and more accessible for pilgrims, yatra personnel and everyone else who uses it, the works serve the larger public interest,” said the BRO.
The organisation’s initiative however has come under criticism from regional parties, which alleged that deployment of heavy machines will disturb the fragile ecology of the region.
In the now-viral video, the earthmover is deployed at the margins of the high-altitude and inaccessible glacier lake of Sheshnag, located 11,780 feet above the sea level, and the lake is spread over 1.1 kilometres in length and 0.7 kilometres in width in Pahalgam.
The visuals and reports of heavy machinery operating near the pristine Sheshnag Lake, in the glacial zone of Pahalgam are very disturbing, raising serious concern among people about the ecological impact of construction in this fragile Himalayan region. With our glaciers already retreating, and recent devastating glacier-related floods in neighbouring Nepal reminding us of the growing vulnerability of the Himalayas, such activities raise alarm.
Kashmir has always warmly welcomed Amarnath Yatra pilgrims, and improving facilities for them has never been an issue. But not at the cost of our fragile ecosystem.
Those governing owe answers to people for the serious environmental concerns created by such “developmental projects”!
Our precious mountains, glaciers and water bodies need protection not plunder, for now and for the future generations. So this must be immediately stopped.
— Mirwaiz Umar Farooq (@MirwaizKashmir) November 23, 2026
Major stopover on Amarnath Yatra
Sheshnag is one of the stopovers for the pilgrims heading for the annual pilgrimage of Amarnath in Anantnag. A macadamised road for the pilgrims ends at Chandanwari and the pilgrims would trek up to Sheshnag lake covering 12 to 13 kilometres on unpaved mountain track in the past. The Amarnath cave is 18-20 km away from the Sheshnag stopover.
Peoples Democratic Party (PDP) spokesperson Mohit Bhan said Sheshnag was not just another lake in the mountains of Kashmir. “In Hinduism, it is the sacred landscape where Lord Shiva is believed to have left behind the serpents before proceeding towards the Amarnath cave to narrate the Amar Katha to Goddess Parvati. There is a profound contradiction in invoking Hindu faith while allowing the very landscape associated with that faith to be disturbed through unnecessary construction, road cutting and surface levelling,” said Mr. Bhan.
He said what is being projected as development must not come at the cost of a fragile alpine ecosystem and a landscape deeply embedded in Hindu religious belief. “Faith and ecology are not competing interests. Both demand protection. You cannot celebrate the sanctity of a pilgrimage while disregarding the sanctity of the landscape through which it passes. If we cannot respect sacred Sheshnag, what exactly are we preserving in the name of the Amarnath Yatra?” said Mr. Bhan.
PDP leader Mehbooba Mufti said her “worst fears were confirmed when the police stopped me from proceeding towards Sheshnag”. “The questions surrounding construction in this fragile glacial ecosystem are only growing louder. What is being concealed today could become a man-made disaster tomorrow. The Amarnath Cave, Yatra and surrounding mountains must be protected as one ecological whole,” said Ms. Mufti.
Raises alarm: Mirwaiz
Kashmir chief cleric Mirwaiz Umar Farooq said the visuals and reports of heavy machinery operating near the pristine Sheshnag lake in the glacial zone of Pahalgam are very disturbing “raising serious concern among people about the ecological impact of construction in this fragile Himalayan region”.
“With our glaciers already retreating, and recent devastating glacier-related floods in neighbouring Nepal reminding us of the growing vulnerability of the Himalayas, such activities raise alarm. Kashmir has always warmly welcomed Amarnath Yatra pilgrims, and improving facilities for them has never been an issue. But not at the cost of our fragile ecosystem. Those governing owe answers to people for the serious environmental concerns created by such “developmental projects”! Our precious mountains, glaciers and water bodies need protection not plunder, for now and for the future generations. So, this must be immediately stopped,” said the Mirwaiz.
CPI(M) legislator M.Y. Tarigami expressed shock over “the use of JCB-type heavy machinery near the lake”. “It is one of the most fragile glacial lakes in the Himalayas and among the 14 high-risk glacial lakes identified in J&K. Visuals showing an excavator cutting and levelling earth near the lake, reportedly for road development along the Amarnath Yatra track, are deeply disturbing,” said Mr. Tarigami.
The CPI(M) leader said Sheshnag is surrounded by loose moraine and steep slopes. “Disturbing this fragile terrain with heavy machinery is an invitation to disaster. Nobody is opposed to development. Pilgrims, tourists and local people deserve better roads and facilities. But development in the high Himalayas must be eco-friendly and sustainable, backed by scientific studies, proper environmental impact assessments and consultations with experts and local communities. The government must immediately stop any work that threatens the lake and its surroundings,” said Mr. Tarigami.
He demanded that the details of the project, the agency carrying it out and the clearances obtained be made public. “A team of glaciologists and environmental experts must inspect the site without delay,” said Mr. Tarigami.
Masroor Ansari, a prominent Shia cleric, said the use of heavy machinery near the pristine lake “is an alarming assault on Kashmir’s fragile Himalayan ecology”. “At a time of retreating glaciers and growing climate vulnerability, such reckless intervention could invite an ecological disaster. I urge the J&K government, Lieutenant Governor administration, BRO and environmental authorities to immediately halt all excavation and construction near the lake, conduct an independent environmental impact assessment and make the project’s clearances public,” said Mr. Masroor.
J&K Apni Party chief Altaf Bukhari and Awami Ittehad Party (AIP) spokesperson Inam-un-Nabi also strongly opposed the road construction. “The AIP demands an immediate halt to excavation near the lake, disclosure of the project’s details and a comprehensive environmental assessment. Sheshnag’s religious sanctity and natural heritage must be protected,” said Mr. Nabi.
J&K Students Association leader Nasir Khuehami said the concern was about the location, scale, nature and environmental implications of the ongoing works near the ecologically fragile Sheshnag lake. “If BRO maintains that all works are being undertaken in accordance with prescribed environmental safeguards, it must answer who authorised the deployment of heavy machinery in the immediate vicinity of Sheshnag lake? Has a comprehensive Environmental Impact Assessment (EIA) been conducted? If so, why has it not been made public? Were all necessary environmental clearances and permissions obtained from the competent authorities? Where are the scientific studies documenting the current glacial health, ice density and ecological condition of the region?” said Mr. Khuehami.
Meanwhile, hundreds of netizens commented on the video that went viral on social media platforms in the past 24 hours. “Sheshnag lake is one of the 14 officially identified high-risk glacial lakes in J&K for GLOF (glacial lake outburst flood). Heavy machinery is being run on its shoreline with zero transparency on environmental clearance or risk assessment. This is not development. This is deliberate endangerment of a fragile alpine ecosystem and downstream communities,” Suhail Ahmed Khan, a native of Kashmir.
Raja Muzaffar Bhat, a prominent environmentalist and activist, said the use of earthmovers at such high-altitude lakes were a “disaster”. “How does such a heavy machine reach our glaciers of Kashmir?” he wondered.
Published – November 23, 2026 01:17 pm IST




